The is a report from the quality assurance testers. It is based on:


Analyzing and Reporting Test Results
to Top

to Top

There are four steps in analyzing and reporting the test results. Review and use the information in module W80c to take you through each step:

  1. Analyzing Notes
  2. Reviewing Specifications
  3. Developing Change Recommendations
  4. Reporting Results
Procedure for Submitting Materials

to Top
to Top
  1. Individual team members get their part of this assignment to the Team Leader by email attachment, or some other method mutually agreed upon in discussion.
  2. Team Leader makes sure all documents in the milestone of which this is a part are gathered together in a compatible form.
  3. Team Leader and/or content specialist check for correct spelling and English usage.
  4. Team leader verifies that material submitted meets the requirements.
  5. Team leader or content specialist FTP the material to the team's Web site, informing the instructor and other team members by emailing to them the URI.